This microbrewery interior retrofit and lanai addition draw from the architectural language of the previous and surrounding structures. A major challenge with this site was designing the wastewater treatment system that is unique to brewery effluent. The design encompasses the adaptive reuse of an historic structure and repurposes an existing sewer tank into a holding tank and pump station, with over 500 feet of below grade coring to extend the force main to another existing waste water treatment plant on owner’s adjacent property. The significant effort and multi-agency approvals was worth the work to create a new home for this local brewery and restaurant.